Germany plans fifth floating LNG import terminal
Berlin continues to use the private sector in its efforts to reduce its dependence on Russian pipeline gas
The German government has selected a consortium comprising German utility Eon, France’s Engie and Belgian-based Tree Energy Solutions (TES) to develop and manage the country’s fifth floating storage and regasification (FSRU) terminal. Berlin and the consortium expect the FSRU to start operations at “the beginning of the heating period in 2023”, according to a joint statement. The floating terminal will have a capacity of 5bn m³/yr, or around 5pc of Germany’s annual gas consumption. Germany has already selected locations for four FSRUs. And there may be more announcements to come, as private developer Deutsche Regas is pursuing another terminal project in partnership with TotalEnergies.
Also in this section
28 March 2024
The country’s largest gas field is a bright spot for the North Sea, boasting cleaner operations amid a changing mood in Europe over hydrocarbons
28 March 2024
Whether OPEC+ starts to unwind its oil production cuts from June will depend on heavily debated unfolding supply-demand balances
28 March 2024
As a gas supply shortfall looms, balancing regulatory flexibility with energy security and investor confidence will be critical
27 March 2024
Oil producers have to untangle the increasingly complicated relationship with their natural resources