ExxonMobil drilling heralds oil era in Guyana
Keen to add to its production base, ExxonMobil hopes to have the oil flowing from offshore Guyana within two years
It's not yet certain whether the tiny Caribbean state of Guyana is in good shape to handle the revolutionary economic and social impact of a multi-billion-dollar oil industry, but we are about to find out. ExxonMobil has announced that drilling started in May on the first development well for the Liza Phase 1 offshore project—the first of 17 production wells planned for this phase. That programme is expected to result in the start of production in 2020 via a floating production, storage and offloading vessel (FPSO) called Liza Destiny. The FPSO, now being converted from an oil tanker, is expected to have a capacity of 120,000 barrels a day (b/d) of oil. Another FPSO with a capacity of 220,00

Also in this section
24 February 2025
Weighed down by higher costs and lower margins, the US downstream sector is facing closures that could shrink capacity
21 February 2025
While large-scale planned LNG schemes in sub-Saharan Africa have faced fresh problems, FLNG projects are stepping into that space
20 February 2025
Greater social mobility means increased global demand for refined fuels and petrochemical products, with Asia leading the way in the expansion of refining capacity
19 February 2025
The EU would do well to ease its gas storage requirements to avoid heavy purchase costs this summer, with the targets having created market distortion while giving sellers a significant advantage over buyers