ExxonMobil drilling heralds oil era in Guyana
Keen to add to its production base, ExxonMobil hopes to have the oil flowing from offshore Guyana within two years
It's not yet certain whether the tiny Caribbean state of Guyana is in good shape to handle the revolutionary economic and social impact of a multi-billion-dollar oil industry, but we are about to find out. ExxonMobil has announced that drilling started in May on the first development well for the Liza Phase 1 offshore project—the first of 17 production wells planned for this phase. That programme is expected to result in the start of production in 2020 via a floating production, storage and offloading vessel (FPSO) called Liza Destiny. The FPSO, now being converted from an oil tanker, is expected to have a capacity of 120,000 barrels a day (b/d) of oil. Another FPSO with a capacity of 220,00
Also in this section
22 November 2024
The Energy Transition Advancement Index highlights how the Kingdom can ease its oil dependency and catch up with peers Norway and UAE
21 November 2024
E&P company is charting its own course through the transition, with a highly focused natural gas portfolio, early action on its own emissions and the development of a major carbon storage project
21 November 2024
Maintaining a competitive edge means the transformation must maximise oil resources as well as make strategic moves with critical minerals
20 November 2024
The oil behemoth recognises the need to broaden its energy mix to reduce both environmental and economic risks