Subscribe  Log in | Register | Advertise | Digital Issue   |   Search
  • Green hydrogen
  • Blue hydrogen
  • Storage & Transportation
  • Consumption
  • Strategies & Trends
  • Finance
  • Interactive Hydrogen Dashboard
Search
Related Articles
HH2E announces second German project
Thierbach development will have initial capacity of 100MW by 2025, with potential to scale up to over 1GW by 2030
Germany and France forge new H2Med link
The countries have agreed to extend the planned pipeline through France, Portugal and Spain into Germany
BP plans large-scale ammonia cracker at Wilhelmshaven
Oil major would use existing infrastructure at German port to send hydrogen to consumers in Ruhr industrial region
Gasunie joins German hydrogen storage project
Dutch gas network operator enters German hydrogen storage sector by joining pilot project at Etzel in Lower Saxony
Adnoc and Thyssenkrupp to explore large-scale ammonia cracking
UAE state company taps German technology firm amid growing interest in scaling up ammonia cracking capacity in Europe
Enagas to acquire 20pc of future UK–Netherlands hydrogen link
The BBL interconnection flows natural gas between the UK and the Netherlands, but could be converted to carry hydrogen as part of the European Hydrogen Backbone
Masdar targets European market via Amsterdam
UAE renewables developer and Dutch firms agree to explore options to supply liquid hydrogen and LOHC through key European port
HH2E taps Nel for Lubmin electrolysers
The Norwegian manufacturer has signed a letter of intent to provide a potential 120MW of capacity to the German developer
Yara to scale up German ammonia imports
Norwegian fertiliser company will modify existing terminals to increase ammonia import capacity to 3mn t/yr
Blastr plans €4bn Finnish green steel plant
Norwegian startup aims to begin production by 2026
Steelmaking is a carbon-intensive process
Germany Netherlands Steel
Tom Young
4 May 2021
Follow @PetroleumEcon
Forward article link
Share PDF with colleagues

Rotterdam port looks for hydrogen imports

Port is working with German steel companies Thyssenkrupp Steel and HKM to evaluate opportunities to import the fuel and transport it to Duisburg

German steel companies Thyssenkrupp Steel and HKM are working with the Port of Rotterdam to evaluate opportunities to import hydrogen. The firms will simultaneously investigate the possibility of a hydrogen pipeline between Rotterdam and facilities operated by Thyssenkrupp and HKM in Duisburg. “Vast imports of hydrogen are necessary if Europe and Germany want to reduce CO₂ emissions and become climate-neutral by 2050, while maintaining its strong industrial backbone,” the firms say. 7-9pc – Steelmaking’s share of global emissions “The cooperation between Rotterdam as Europe’s largest port and Duisburg as Europe’s largest steel site can have a signalling effect to establish supply cha

Welcome to the PE Media Network

PE Media Network publishes Petroleum Economist, Hydrogen Economist and Carbon Economist to form the only genuinely comprehensive intelligence service covering the global energy industry

 

Already registered?
Click here to log in
Subscribe now
to get full access
Register now
for a free trial
Any questions?
Contact us

Comments

Comments

{{ error }}
{{ comment.comment.Name }} • {{ comment.timeAgo }}
{{ comment.comment.Text }}
Also in this section
Abu Dhabi steps on the emissions-reduction accelerator
27 January 2023
State-owned energy companies are intensifying efforts to decarbonise the emirate’s crude oil production and carve out a leading role in the nascent global hydrogen trade
Plug walks away from FFI’s Gladstone gigafactory
27 January 2023
Australian developer will manufacture in-house technology instead, as Plug argues it can get better value elsewhere
IHI mulls ammonia conversion for LNG terminals
27 January 2023
Japanese engineering firm will study feasibility of minimally modifying LNG receiving and storage terminals during the second half of this decade
Octopus Hydrogen scraps Kemble project
26 January 2023
UK developer has opted to cancel 1MW project at Kemble and reroute electrolyser to Mira owing to delivery issues with the latter

Share PDF with colleagues

COPYRIGHT NOTICE: PDF sharing is permitted internally for Petroleum Economist Gold Members only. Usage of this PDF is restricted by <%= If(IsLoggedIn, User.CompanyName, "")%>’s agreement with Petroleum Economist – exceeding the terms of your licence by forwarding outside of the company or placing on any external network is considered a breach of copyright. Such instances are punishable by fines of up to US$1,500 per infringement
Send

Forward article Link

Send
Sign Up For Our Newsletter
Project Data
Maps
PE Store
Social Links
Social Feeds
  • Twitter
Tweets by Hydrogen Economist
Featured Video
Home
  • About us
  • Subscribe
  • Reaching your audience
  • PE Store
  • Terms and conditions
  • Contact us
  • Privacy statement
  • Cookies
  • Sitemap
All material subject to strictly enforced copyright laws © 2023 The Petroleum Economist Ltd
Cookie Settings
;

Search