Gasunie and Thyssengas plan German hydrogen corridor
The north–south network will transport hydrogen from Wilhelmshaven to industrial users in Wesseling by 2028
Gas infrastructure companies Gasunie and Thyssengas have announced plans to commission a 400km hydrogen network between Wilhelmshaven and Wesseling by 2028. The firms expect to transport hydrogen produced at the planned green energy hub in Wilhelmshaven—where a 500MW electrolyser is planned—as well as imports from Norway to industrial users near Cologne. Gasunie and Thyssengas expect to both repurpose existing gas pipelines and construct new hydrogen pipelines for the network. The northern half of the network will also include storage facilities at the Nuettermoor and Etzel salt caverns, which currently store natural gas. Gasunie is a partner on a study to test hydrogen storage in the cavern
Also in this section
22 November 2024
The Energy Transition Advancement Index highlights how the Kingdom can ease its oil dependency and catch up with peers Norway and UAE
21 November 2024
Maintaining a competitive edge means the transformation must maximise oil resources as well as make strategic moves with critical minerals
20 November 2024
The oil behemoth recognises the need to broaden its energy mix to reduce both environmental and economic risks
15 November 2024
Danish electrolyser firm stays focused on US expansion plans amid policy uncertainty in wake of Republican election victory