Energiequelle joins Finland’s green hydrogen push
German firm reserves site for three-phase project as developers flock to Europe’s latest green hydrogen hotspot
German independent developer Energiequelle has joined the race to tap Finland’s low-cost power supplies, with plans to deploy up to 500MW of electrolyser capacity to produce green hydrogen at the Nordic country’s northwestern port city of Oulu. The company has reserved a greenfield site for the project, which it plans to develop in three phases, with commissioning envisaged between 2028 and 2033, depending on market conditions and ability to reach FID. The first phase of the project would be for up to 5MW of capacity, coupled with a hydrogen refuelling station for buses and other heavy-duty vehicles. Phase two would see capacity rise to10–50MW, with the potential for pipeline and seaborne e

Also in this section
16 May 2025
Only 21% of approved IPCEI projects reach FID as cost overruns and funding delays hamper progress, according to European Commission officials
14 May 2025
Defining moment for US hydrogen sector as House Republicans seek termination of green tax credits
13 May 2025
Existing specifications have been a good starting point for standardisation of hydrogen quality, but they need rethinking—a 99.5 mol-% specification is a promising candidate
12 May 2025
The sector needs a standard covering hydrogen quality for the entire value chain, but no single hydrogen quality covers the needs of all stakeholders