Subscribe  Log in | Register | Advertise | Digital Issue   |   Search
  • Green hydrogen
  • Blue hydrogen
  • Storage & Transportation
  • Consumption
  • Strategies & Trends
  • Finance
  • Interactive Hydrogen Dashboard
Search
Related Articles
Octopus Hydrogen scraps Kemble project
UK developer has opted to cancel 1MW project at Kemble and reroute electrolyser to Mira owing to delivery issues with the latter
HH2E announces second German project
Thierbach development will have initial capacity of 100MW by 2025, with potential to scale up to over 1GW by 2030
Hydrogen Optimized electrolyser demonstrates high performance
Capabilities tested in simulation of inputs from a potential 30GW Mauritanian wind-to-hydrogen project are ‘critical’ to success of green hydrogen mega-projects, manufacturer tells Hydrogen Economist
Ceres electrolyser tests signal 25pc efficiency gain
Electrolyser and fuel-cell manufacturer says initial tests on new modular technology yield positive results
Trafigura sets 3GW green hydrogen target
Trader seeks more exposure to production projects as it nears FID on 1GW Danish facility
Topsoe to supply Inner Mongolia green ammonia project
Danish company sells dynamic electrolyser technology to China’s Mintal for plant at Baotou
John Cockerill eyes regional manufacturing bases
Firm is looking to manufacture electrolysers in the EU, the Middle East, Morocco, China and North America
Sauk Valley Hydrogen slips to Q2
Invenergy’s first hydrogen project was due to come online at the end of 2022
Electrolyser manufacturing to rise tenfold by 2030 – IEA
Industry must be wary of regional concentration to avoid supply chain disruption, agency says
Hystar secures $26mn in series B
Norwegian PEM electrolyser manufacturer plans to have gigawatt-scale production capacity in place by 2025
The plant will be located in Denmark
Electrolysers Denmark
Tom Young
1 September 2022
Follow @PetroleumEcon
Forward article link
Share PDF with colleagues

Topsoe takes FID on solid-oxide electrolyser plant

Firm hopes to begin operations at facility in Denmark in 2024

Electrolyser manufacturer Topsoe has taken FID on a solid-oxide electrolyser cell (SOEC) manufacturing facility in Herning, Denmark. The 500MW/yr project will be the world’s largest SOEC production facility and could be expanded to 5GW/yr in the future, assuming adequate demand. The DKK2bn ($270mn) project is the single biggest investment in the firm’s history. “The case for using electrolysis to produce green fuels is now well established, but manufacturing capacity has always been the challenge. We are facing this challenge head on,” says Topsoe CEO Roeland Baan. Topsoe says it has already pre-sold 500MW of capacity from the facility and is in discussions with other potential offtake partn

Welcome to the PE Media Network

PE Media Network publishes Petroleum Economist, Hydrogen Economist and Carbon Economist to form the only genuinely comprehensive intelligence service covering the global energy industry

 

Already registered?
Click here to log in
Subscribe now
to get full access
Register now
for a free trial
Any questions?
Contact us

Comments

Comments

{{ error }}
{{ comment.comment.Name }} • {{ comment.timeAgo }}
{{ comment.comment.Text }}
Also in this section
Neom project cost balloons to $8.5bn
3 February 2023
The three JV participants have also opted to shake up project financing, according to co-developer Air Products
Turkey outlines hydrogen plans
3 February 2023
The government prioritises replacing imported gas in the domestic energy system in a broad, heavily backloaded strategy
Equinor quits Barents Blue and Polaris
2 February 2023
Norwegian state-owned company walks away from ammonia and associated CCS projects after cooperation agreement expires
TotalEnergies and Air Liquide launch hydrogen refuelling JV
2 February 2023
Major joins growing list of companies exploring opportunities for hydrogen in road transport

Share PDF with colleagues

COPYRIGHT NOTICE: PDF sharing is permitted internally for Petroleum Economist Gold Members only. Usage of this PDF is restricted by <%= If(IsLoggedIn, User.CompanyName, "")%>’s agreement with Petroleum Economist – exceeding the terms of your licence by forwarding outside of the company or placing on any external network is considered a breach of copyright. Such instances are punishable by fines of up to US$1,500 per infringement
Send

Forward article Link

Send
Sign Up For Our Newsletter
Project Data
Maps
PE Store
Social Links
Social Feeds
  • Twitter
Tweets by Hydrogen Economist
Featured Video
Home
  • About us
  • Subscribe
  • Reaching your audience
  • PE Store
  • Terms and conditions
  • Contact us
  • Privacy statement
  • Cookies
  • Sitemap
All material subject to strictly enforced copyright laws © 2023 The Petroleum Economist Ltd
Cookie Settings
;

Search