ITM Power acquires site for second factory
Firm intends to build a factory on the site capable of producing 1.5 GW/yr of electrolysers that it hopes to be fully operational by the end of 2023
UK electrolyser manufacturer ITM Power has acquired a site for its second factory in Tinsley, Sheffield. ITM intends to build a factory on the site capable of producing 1.5GW/yr of electrolysers that it hopes to be fully operational by the end of 2023. The site will be in addition to ITM’s 1GW/yr facility at nearby Bessemer Park, completed in January. The overall cost of the new Sheffield factory is expected to be £50-55mn ($68-74mn). In addition to the £13.4mn cost of the land, the company is allocating up to £16mn for the construction of the shell and £20-25mn for the equipment and power supply. Last month, the firm raised £250mn in equity financing to support the expansion of its manufact
![](/images/white-fade.png)
Also in this section
18 December 2024
Central Asian country’s vast wind and solar resources have attracted a $50b electrolytic hydrogen mega-project aimed at exporting to Europe
17 December 2024
Sultanate prepares to offer international hydrogen project developers more land concessions but refines auction design as global industry sentiment cools
17 December 2024
Siemens Energy and Air Liquide collaborate on first commercial-scale electrolyser to be deployed at an industrial site in Europe
16 December 2024
Sustainable aviation fuel from electrolysis has great potential for reducing aviation sector emissions, but cost, energy requirements and the need for substantial investment stand in the way of take-off