BP, Iberdrola and Enagas eye Spanish green hydrogen project
Project would have a 20MW electrolyser powered by a number of renewable sources including a 40MW solar PV plant
BP, utility Iberdrola and gas transportation firm Enagas are to conduct a feasibility steady on the construction of a green hydrogen production plant in Castellon, Spain. If the study is successful, the project could start operating from 2023. 115MW – Potental size of electrolyser With an initial €90mn ($109mn) investment, the project would have a 20MW electrolyser powered by a number of renewable sources including a 40MW solar PV plant. The electrolysis capacity could increase to 115MW with further investment. The project would provide green hydrogen to replace grey hydrogen used at the BP refinery in Castellon, reducing CO₂ emissions by 24,000 t/yr. It could also incentivise around
Also in this section
20 January 2025
China and India are leading the region in terms of electrolyser development, while Australia accounts for nearly half of Asia’s active hydrogen projects
17 January 2025
Bank’s UK arm signs first deal to finance a green hydrogen developer, but cost and offtake pressures mean the sector remains too risky for many lenders
15 January 2025
The country’s technology-neutral position and competitive business environment mean it is looking to be surfing the second wave of the energy transition while others are still grappling with the first
14 January 2025
With abundant wind and sunshine, Africa is poised to lead in green hydrogen production. Yet high costs and financing challenges require global partnerships to unlock the continent's potential