20 June 2024
NEXTCHEM awarded PDP contract for multi-billion-euro Hail and Ghasha project
MAIRE announced that NEXTCHEM (Sustainable Technology Solutions) will act as technology design integrator to develop the process design package (PDP) for the hydrogen and carbon dioxide (CO2) recovery unit of the Hail and Ghasha gas development project.
MAIRE announced that NEXTCHEM (Sustainable Technology Solutions) will act as technology design integrator to develop the process design package (PDP) for the hydrogen and carbon dioxide (CO2) recovery unit of the Hail and Ghasha gas development project. The Hail and Ghasha project, a package of which was awarded to Tecnimont (MAIRE’s Integrated E&C Solutions) by ADNOC in October 2023 for an overall value of $8.7 B, is one of the most strategic initiatives globally to decarbonize the energy processing industry. The project is aimed to operate with net-zero CO2 emissions, also thanks to the recovery units to be developed by NextChem Tech which will allow the capture and storage of 1.5 mill
Also in this section
21 January 2025
The new president must put his cards on the table and tell the American people, and the world, if the US is formally abandoning the energy transition
14 January 2025
Bioenergy will be a key part of the energy transition as the world decarbonises, and Brazil is set to be a major player in the sector
14 January 2025
The region has ample resources of both gas and renewable energy and developing both will be vital to the global effort to reduce emissions
13 January 2025
The region’s fast-growing economies stand at a pivotal juncture, with the opportunity to drive a sustainable growth strategy that will keep the world’s net-zero ambitions alive