Equinor agrees project to tap Dunkirk emissions
State-backed energy firm agrees with French TSO GRTgaz to develop links into Norwegian CO₂ storage
Norwegian energy company Equinor and French gas transmission operator GRTgaz have signed a project development agreement aimed at creating a transport system capable of taking CO₂ captured from industrial emitters in northern France to permanent storage in Norway. The joint project envisages GRTgaz developing a 30km onshore pipeline network and compressor station in the Dunkirk industrial region, sending CO₂ into the offshore pipeline connecting to CO₂ Highway Europe—a planned 1,000km line linking the port of Zeebrugge in Belgium to storage sites off Norway. Feasibility studies are under way, with the aim of launching basic engineering studies at the end of 2024 and commissioning in 2029. Th
Also in this section
21 January 2025
The new president must put his cards on the table and tell the American people, and the world, if the US is formally abandoning the energy transition
14 January 2025
Bioenergy will be a key part of the energy transition as the world decarbonises, and Brazil is set to be a major player in the sector
14 January 2025
The region has ample resources of both gas and renewable energy and developing both will be vital to the global effort to reduce emissions
13 January 2025
The region’s fast-growing economies stand at a pivotal juncture, with the opportunity to drive a sustainable growth strategy that will keep the world’s net-zero ambitions alive