Ineos Grangemouth complex joins Acorn CCS project
Boost for Scottish Cluster as Grangemouth targets 1mn t/yr carbon capture by 2027
Ineos and its oil trading joint venture Petroineos have signed a memorandum of understanding to bring the Grangemouth refining and petrochemicals complex into the Acorn carbon capture and storage project in northeast Scotland. The initiative would cover Ineos’ entire Grangemouth site, one of the UK’s largest industrial complexes, and enable the capture and storage of approximately 1mn t/yr of CO2 by 2027, with the scope to capture further significant volumes beyond this date, according to UK-based Ineos. “We acknowledge that we are operating a carbon dioxide intensive industry and we have a significant role to play in helping Scotland reach its net carbon zero target by 2045” Gardner,
Also in this section
9 January 2026
A shift in perspective is needed on the carbon challenge, the success of which will determine the speed and extent of emissions cuts and how industries adapt to the new environment
2 January 2026
This year may be a defining one for carbon capture, utilisation and storage in the US, despite the institutional uncertainty
23 December 2025
Legislative reform in Germany sets the stage for commercial carbon capture and transport at a national level, while the UK has already seen financial close on major CCS clusters
15 December 2025
Net zero is not the problem for the UK’s power system. The real issue is with an outdated market design in desperate need of modernisation






